Sign In | Join Free | My vivirlatino.com
vivirlatino.com
Dongguan Qianghui Foaming Machinery Technology Co., Ltd.
Dongguan Qianghui Machinery Co., Ltd specialized in manufacture foam machine and cutting machine
Home > Foam Making Machine >

PU Foam Making Machine With Clamp Long Foam Block Unit 2000mm/min~7000mm/min

Dongguan Qianghui Foaming Machinery Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

PU Foam Making Machine With Clamp Long Foam Block Unit 2000mm/min~7000mm/min

Brand Name : QHMACH
Model Number : QHF-2017A
Certification : CE Certificate
Place of Origin : Dongguan China
MOQ : one set
Price : inquiry
Payment Terms : Western Union, L/C, T/T
Supply Ability : two sets per month
Delivery Time : 45 days
Packaging Details : To be pack in paper with plastic film and wooden case water proof packing
Overall Dimension : 35m*4.5m*3.2m
Product Height : Max. 1300mm
Maximum Capacity : 200~300L/min
Application Area : Sponge, Polyurethane Foam, Mattress, Furniture
Product Width : 1200mm~2300mm (adjutable)
Capacity : 2000mm/min~7000mm/min
Foaming Model : Full Automatic
Raw Material : PPG, TDI, MC, A33, T9, Silicone Oil, H2O, Pigment, Ect
R.S.system : R.S.pulling system with the plastic film
Conveyer : For long sheet foam 50m conveyer
Contact Now

Horizontal Continuous Foam Making Machine with Clamp Long Foam Block Unit


This equipment is on trail of 6-100KG/M3 hard/ soft PU foaming production. It’s applicable to furniture, bra,shoes,garment and so on. PLC operation system,automatic program,low production cost are large-scale manufacturer’s ideal equipments.


Main technique specification:


1, Dimension:Total length 40m×Total width 4m×Total Height 3m

2, Foaming material Group: 13 groups, man-machine interface, both manual and computerized control.

3, Foaming width: 980mm~2350mm

4, Foaming height: Max 1300mm

5, Foaming density: 8Kg/m³~100kg/m³

6, Foaming speed: 2000r/min~7000r/min

7, Max total output:300kg/min

8, Material spraying way:

① The way of down sprayer head (upper, down, front, back can be adjusted)

② The way of trough overflow pipe.

9, Controlling way of foaming:

① PLC controlling, can continuously foaming two different formulas in one time

② All inverter controlling foaming and work in phase with the production line

③ Oven declining board height and width can be adjusted by control box.

④ Oven side links width can be adjusted by control box.

10, Mixing –head motor: 37kw

11, Total power: About 90kw


Transducer Types

ModelPower/kw

Use

QtyBrand
FC36037

Mixing head

1Danfoss
FC-051P7.5

PPG+CaCo3

1Danfoss
FC-051P5.5

PPG

1Danfoss
FC-051P4

TDI

1Danfoss
FC-051P2.2

MC , Flame retardant

2Danfoss
FC-051P1.5

Black

1Danfoss
FC-051P0.75Water, Ann, Si, Tin, Color A/B Anti-yellow7Danfoss
FC-051P0.75

Spray head

1Danfoss
FC-051P5.5/3.7/1.5Oven inner conveyer line,side conveyer line, cutting machine3Danfoss
FC-051P7.5

Conveyor belt

1Danfoss

Pump of loding material

Model

Specification

UseQty/setBrand
KCB-83.3

200L/min

PPG Loding1China
CB-13

200 L/min

PPG+CaCo3 loding1China
NB-63

120 L/min

TDI loding1Shanghai
NB-32

30 L/min

MC loding1Shanghai
KCB-5525 L/minFlame retardant loding1China

Techniques and After-sale Services:


1,Buyer should assist seller to undertake the testing. Both seller and buyer should be responsible for the on-site testing of the production line. The testing is mainly for three formulas including high, medium and low density.


2,During the testing, If the raw material waste is caused by seller’s technical problems or the quality of the production line (i.e. foam collapse, burnings, or machine malfunction), the additional portion of the raw materials that over 2 tons are on seller’s account. The problems not related to seller’s are on buyer’s account.


3,During installation, seller will send technicians to buyer’s place of business. Buyer should arrange his staffs to assist the technicians with the installation, and prepare water, electricity and place for installation.


4,The machines are in simple packing.


5,During installation and testing, buyer is responsible for the food, Visa fee, turn-round flight tickets and accommodation for the technicians sent by seller. Buyer also should pay $40/day/person as the allowance for the technicians sent by the seller.


6,The machines are under one year warranty (in the circumstance of normal use). Natural damage, non-professional demolition, maintenance errors are not within the scope of warranty.


7,After warranty period, seller will provide paid service for machine maintenance.


Payment Terms:

After signing of the contract, buyer pays as the advance payment 30% of total price , when seller gets the deposit, the contract takes into effect; the balance of 70%will be paid by buyer before shipment.



QHF-2017-13 groups(standard).pdf


Product Tags:

foam production machine

      

foam making equipment

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

PU Foam Making Machine With Clamp Long Foam Block Unit 2000mm/min~7000mm/min Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Dongguan Qianghui Foaming Machinery Technology Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0